Question 1 |
Which of the following techniques can be used in developing project team?
A | Leadership, mentoring, social events, and empathy; create and give recognition and rewards. |
B | Establish ground rules for appropriate team members behavior, and gain training when needed. |
C | All choices are right. |
D | Encouraging team work, and intercommunicating honestly and in timely manner. |
Question 1 Explanation:
All choices are right.
[1 - 9.3.2 Develop Project Team: Tools and Techniques]
Question 2 |
What does project sponsor do prior or during project initiation?
A | Generates project statement of work if it is not done by the customer. |
B | Provides information about initial scope of the project. |
C | All choices are right. |
D | Advocates the project and ensures its buy-in throughout of the performing organization. |
Question 2 Explanation:
All choices are right.
Question 3 |
There is a lack of resources on the project. Who is responsible to provide resources to the project?
A | PMO and functional manager. |
B | Sponsor and project manager. |
C | Project manager. |
D | Sponsor and functional manager. |
Question 3 Explanation:
Sponsor and functional manager are responsible to provide appropriate resources to the project.
[1 - 9 Human Resources]
Question 4 |
Which of the following describes life cycle of a project team?
A | Forming, storming, norming, performing, adjourning. |
B | Defining, identifying, acquiring, using, releasing. |
C | Acquiring, building, developing, releasing. |
D | Acquiring, using, releasing. |
Question 4 Explanation:
Forming - putting together a team; storming - solving disagreements within the team; norming - reaching working relations; performing - reaching highest level of working efficiency; adjourning - releasing resources from the project as the work is completed.
[1 - 9.3.2 Develop Project Team: Tools and Techniques]
Question 5 |
What is the role of functional manager on the project?
A | Coordinating with project manager and assigning selected individuals to the project team. |
B | All choices are right. |
C | Provide subject matter expertise, and provide input to planning of work packages. |
D | Informing project manager about possible impact on or to other projects. |
Question 5 Explanation:
All choices are right.
[1 - 9 Human Resources, and 1 Project Management Framework]
Question 6 |
Which types of organizational charts are used in Develop Project Resource Management Plan process?
A | Matrix-based charts - is two dimensional presentation of the resources against work packages or activities. In other words it called responsibility assignment matrix (RAM). |
B | Hierarchical-type charts - graphically presenting the hierarchical relations between departments, as well as some key roles. In other words it called Organizational Breakdown Structure (OBS). |
C | All choices are correct. |
D | Text-oriented formats - responsibilities that require detailed description can be provided in text-oriented format. |
Question 6 Explanation:
The hierarchical charts help to identify the relations between departments and team members. RACI (responsible, accountable, consult, and inform) is one of the examples of RAM charts.
[1 - 9.1.2 Human Resources: Tools and Techniques]
Question 7 |
What does a project manager use to Develop Project Resource Management Plan?
A | All choices are right. |
B | Networking. |
C | Organization charts and position descriptions. |
D | Organizational theory. |
Question 7 Explanation:
All choices are right.
[1 - 9.2 Human Resources: Tools and Techniques]
Question 8 |
What responsibilities does a project team have?
A | Identify constrain and assumptions; create WBS and WBS Dictionary. |
B | All choices are right |
C | Identify and work with stakeholders; identify and gather requirements. |
D | Break the work packages into schedule activities, and assist in identification of dependencies between work activities. |
Question 8 Explanation:
A project team members may belong to different groups, functions, but are assigned to activities for the same project. A team can be divided into sub-teams according to need. Usually project teams are only used for a defined period of time. They are disbanded after the project is deemed complete. Due to the nature of the specific formation and disbandment, project teams are usually in organizations.
http://en.wikipedia.org/wiki/Project_team
[1 - 9 Human Resources]
Question 9 |
In which of the following processes the stakeholders may be involved?
A | Verifying scope, identifying constrains, requirements and risks; take risk response ownership. |
B | Development of project plan, and change management processes. |
C | Creation of project charter, and project scope statement. |
D | All choices are right. |
Question 9 Explanation:
All choices are right.
[1 - 9 Human Resources, and 1 Project Management Framework]
Question 10 |
Which of the following processes belongs to the planning process group?
A | Manage Project Team. |
B | Develop Project Team. |
C | Acquire Project Team. |
D | Develop Human Resource Plan. |
Question 10 Explanation:
Develop Human Resource Plan is a planning process; the rest of Human Resource Management processes belong to Executing process group.
[1 - 9 Human Resources]
Question 11 |
What is the role the project team play?
A | Participate in the risk management process. |
B | Comply with quality and communication plans. |
C | Provide time and cost estimates. |
D | All choices are right. |
Question 11 Explanation:
A project team is a team whose members usually belong to different groups, functions and are assigned to activities for the same project. A team can be divided into sub-teams according to need. Usually project teams are only used for a defined period of time. They are disbanded after the project is deemed complete. Due to the nature of the specific formation and disbandment, project teams are usually in organizations.
http://en.wikipedia.org/wiki/Project_team
[1 - 9 Human Resources]
Question 12 |
Who is the main decision maker in case of major change in project delivery?
A | PMO. |
B | Project manager. |
C | Sponsor. |
D | Project Team. |
Question 12 Explanation:
Sponsor is the main decision maker in major changes on the project.
[1 - 9 Human Resources]
Question 13 |
The project requires more funds than assumed initially. Who is in charge for this situation?
A | Project manager. |
B | Sponsor. |
C | Team. |
D | Functional manager. |
Question 13 Explanation:
It is Sponsor's role to provide project with required funding.
[1 - 9 Human Resources]
Question 14 |
A functional manager is trying to assign a team member an additional work not related to the project project. Who should clarify the status if such additional work would be possible?
A | The team member should provide functional manager with information about his/her workload to clarify if additional load is possible. |
B | Project manager should provide functional manager with with information about team member's workload to clarify if additional load is possible. |
C | Sponsor assigns people on the project so have to provide functional manager with with information about team member's workload to clarify if additional load is possible. |
D | PMO assigns people on the project so have to provide functional manager with with information about team member's workload to clarify if additional load is possible. |
Question 14 Explanation:
The team member should provide functional manager with information about his/her workload to clarify if additional load is possible.
[1 - 9 Human Resources]
Question 15 |
Project management team members are confused regarding priorities among projects. Who is responsible for this situation?
A | Company's management or PMO. |
B | Functional managers or Project managers. |
C | Sponsor or program manager. |
D | Project managers or project teams. |
Question 15 Explanation:
Sponsor or program manager, depends on organizational structure is responsible to determine priorities between projects in the company's portfolio or in program.
[1 - 9 Human Resources]
Question 16 |
What does not the Acquire Project Team process use?
A | Enterprise environmental factors. |
B | Project management plan. |
C | Organizational process assets. |
D | Risk management plan. |
Question 16 Explanation:
Risk management plan is nor an input to Acquire Project Team process.
[1 - 9.2.1 Acquire Project Team]
Question 17 |
Which of the following Ground Rules would be useful on the project?
A | Honesty in communications, and timing for status or notification about issues to deliver the work. How the changes in calendar to be coordinated and approved. |
B | How keep meeting focusing on the agenda and within boundaries of talking. |
C | What is an acceptable way to interrupt one another during meetings. |
D | All choices are right. |
Question 17 Explanation:
All choices are right.
[1 - 9.4.2 Manage Project Team: Tools and Techniques]
Question 18 |
A new team member decided to use another implementation method. The project team disagrees with priorities among activities. Who is responsible in this situation?
A | Project manager. |
B | Team member. |
C | Functional manager. |
D | Sponsor. |
Question 18 Explanation:
A team member is free to use more advanced method if it is coordinated with the project manager and team, meets project scope requirements, quality, cost and time constrains settled by project manager.
[1 - 9 Human Resources]
Question 19 |
What of the following is wrong about the role of Project Manager?
A | Selecting, improving and leading in project processes. |
B | Identifying dependencies and scheduling work on work packages and activities. |
C | Have to be an expert in both technical area and in project management. |
D | Maintaining monitoring and control throughout the project and determining if any change is required. |
Question 19 Explanation:
Project manager does not have to be an expert in technical area, but being and expert in project management is the duty.
[1 - 9 Human Resources, and 1 Project Management Framework]
Question 20 |
What does project sponsor do?
A | Provides project funding, clarifying scope, monitoring progress, and influencing others in order to benefit the project. |
B | All choices are right. |
C | Audits the project to ensure all processes and standards are followed. |
D | Monitors progress of work packages, and convinces stakeholders accepting project results. |
Question 20 Explanation:
Sponsor provides funding to the project, and assists management team in clarifying project scope, monitoring project progress, and influencing others for the benefits of the project. There is a saying "sponsor is the best friend of the project manager".
[1 - 9 Human Resources]
Question 21 |
New requirements were added to the project, which need additional funds and time. Who should be involved in this situation?
A | Sponsor. |
B | Team. |
C | Project manager. |
D | Functional manager. |
Question 21 Explanation:
In this case some additional work was added to the project, which was not supported with neither project budget nor management reserve - Sponsor's involvement is required.
Question 22 |
who does determine stakeholders role and responsibilities on the project?
A | Stakeholders. |
B | Project manager and stakeholders. |
C | Project manager. |
D | PMO. |
Question 22 Explanation:
Project manager and stakeholders determine role of stakeholders on the project.
[1 - 9 Human Resources]
Question 23 |
Which organizational process assets will not be used in Develop Project Resource Management Plan process?
A | Configuration management system. |
B | Templates for organizational chart and position descriptions. |
C | Organizational standards processes an policies, and standardized role descriptions. |
D | Historical information on organizational structures that have worked in previous projects. |
Question 23 Explanation:
Configuration management system is used to keep the right version of the documents available. Other choices will be used in the process as input.
[1 - 9.1 Develop Human Resources Management Plan]
Question 24 |
Which of the following are outputs of Manage Project Team process?
A | Change requests. |
B | Enterprise environmental factors update, and organizational process assets updates. |
C | All choices are right. |
D | Project management plan updates. |
Question 24 Explanation:
All choices are right. Manage Project Team process belong to executing process group and addresses the team day-to-day activities.
[1 - 9.4.3 Manage Project Team: Outputs]
Question 25 |
Which of the following techniques can be applied in managing project team activites?
A | Penalty - coercive method to reach the objective. |
B | Forma/legitimate - using the position/role definition. Reward - the ability to provide advantage. |
C | Expert - demonstrating expert level of confidence in the matter. Referent - comes from others, who value your fame and charisma. |
D | All choices are correct. |
Question 25 Explanation:
All choices are right.
[1 - 9.4.2 Manage Project Team: Tools and Techniques]
Question 26 |
What responsibilities does sponsor carry during project planning?
A | Helps evaluate trade-offs during crushing, fast tracking, and re-estimating. |
B | All choices are right. |
C | Approves the final project management plan. |
D | Provides expert judgement. |
Question 26 Explanation:
All choices are right.
Question 27 |
Which of the following activities may positively influence on project team development?
A | Milestone parties, cerebration of birthdays and holidays. |
B | All choices are right. |
C | Participating in group training, participating tours and trips together. |
D | Creating WBS, participating in planning activities. |
Question 27 Explanation:
All choices are right. Gathering a project team outside of day-to-day activities helps to create healthy relations and increase work performance.
[1 - 9.3.2 Develop Project Team: Tools and Techniques]
Question 28 |
What does the Develop Project Team process deliver?
A | Project staff assignments. |
B | Team performance assessments, and enterprise factors update. |
C | Human resources plan. |
D | Resource calendars. |
Question 28 Explanation:
Team performance assessments, and enterprise factors update are outputs of Develop Project Team process.
[1 - 9.3.3 Develop Project Team: Outputs]
Question 29 |
What does project sponsor do prior or during project initiation?
A | Guides the process to get project approval and formalization, and assists project manager. |
B | Give a project manager authority via project charter. |
C | Dictate milestones, determine priorities between constrains, and between projects. |
D | All choices are right. |
Question 29 Explanation:
All choices are right.
Question 30 |
Which of the following processes is confirming human resources availability and obtaining the team necessary to complete project assignments?
A | Manage project team. |
B | Develop human resource plan. |
C | Develop project team. |
D | Acquire project team. |
Question 30 Explanation:
Acquire project team is the process to confirming human resources availability and obtaining the team necessary to complete project assignments.
[1 - 9 Human Resources]
Question 31 |
The project is out of schedule. Who is responsible for this situation?
A | Sponsor. |
B | Functional manager. |
C | Project manager. |
D | Team. |
Question 31 Explanation:
The project manager should control project schedule and responsible for schedule divination.
[1 - 9 Human Resources]
Question 32 |
What does not Acquire Project Team process deliver?
A | Human resources plan. |
B | Project staff assignments. |
C | Project management plan updates. |
D | Resource calendars. |
Question 32 Explanation:
Human resources plan is an output if Develop Human Resource Plan - other choices are right.
[1 - 9.2.3 Acquire Project Team: Outputs]
Question 33 |
The project team does not have a clue who is managing the project. Who is responsible for this situation?
A | Team. |
B | Sponsor. |
C | Functional manager. |
D | Project manager. |
Question 33 Explanation:
Sponsor describes project manager's authority in project charter, and assigns a project manager during project initiation.
[1 - 9 Human Resources]
Question 34 |
What is the role of Human Resource Management in projects?
A | Organize |
B | Manage. |
C | All choices are right. |
D | Lead the project team. |
Question 34 Explanation:
Human Resource Management is a project management area of knowledge that helps to organize, manage, and lead project team.
[1 - 9 Human Resources]
Question 35 |
What does a project manager responsible for human resources on the project?
A | All choices are right. |
B | Provide report of team members' performance for entering to their official employment records. |
C | Address the team members needs. |
D | Create recognition and award system and send out letters of commendation to team members and their managers. |
Question 35 Explanation:
All choices are right.
[1 - 9 Human Resources]
Question 36 |
The sponsor sets an unrealistic end-date of the project. Who is responsible in this situation?
A | Sponsor. |
B | Functional manager. |
C | Project manager. |
D | Team. |
Question 36 Explanation:
Only the sponsor can make such significant change in the project charter, where the target date is provided.
[1 - 9 Human Resources]
Question 37 |
What effect does early involvement of team in planning have on project?
A | All choices are right. |
B | Increases waste of funds and time. |
C | Adds expertize, and increases commitments. |
D | Helps identify skills of the assigned resources. |
Question 37 Explanation:
Early involvement of the team in project planning increases their expertize, and commitments to the project.
[1 - 9 Human Resources]
Question 38 |
A functional manager assigned a project team member to a full time work not related to the project project. Who should clarify the status if such additional work would be possible?
A | Sponsor (protect project from losing resources, etc.) |
B | Project manager needs to deal with the situation (close the gap, etc.). |
C | Manager PMO (prioritize projects and work, etc.). |
D | Functional manager (find replacement, etc.). |
Question 38 Explanation:
Project manager needs to deal with this situation (close the gap, etc.).
[1 - 9 Human Resources]
Question 39 |
What are responsibilities of a sponsor during project executing?
A | Assist project manager in monitoring progress. |
B | All choices are right. |
C | Approve and reject changes and clarify scope details. |
D | Lead quality assurance reviews. |
Question 39 Explanation:
All choices are right.
[1 - 9 Human Resources]
Question 40 |
Some of the project team members can be assigned to selected project management responsibilities; in that case they are considered part of the _____.
A | Change control board. |
B | Executive team members. |
C | Project management team. |
D | Steering committee. |
Question 40 Explanation:
Some of the project team members can be assigned to selected project management responsibilities; is that case they are considered part of the Project Management Team.
[1 - 9 Human Resources]
Question 41 |
There was a rumor that the project is going to be canceled. Who should address this issue?
A | Sponsor. |
B | Functional manager. |
C | Project manager. |
D | Team. |
Question 41 Explanation:
Sponsor advocates the project, and protects from such big changes.
[1 - 9 Human Resources]
Question 42 |
What is the role the project sponsor play during project closing?
A | Generate final performance report. |
B | Provides input to lessons learned and updates project documentation. |
C | Testing the project results against project charter. |
D | Accepting project deliverables and supporting historical records. |
Question 42 Explanation:
During closing a project or phase, sponsor is accepting project deliverables and supporting historical records. Sponsor can provide input to Lessons Learned, but this shout be done by stakeholders. The actual testing is usually part of executing phase, but belongs to monitoring and controlling process group, and done against the requirements, not project charter. Final performance report should be generated by the project manager, not sponsor.
[1 - 9 Human Resources]
Question 43 |
What What of the following duties does the Program Manager carry?
A | Managing a group of project managers assigned on different projects. |
B | Managing multiple project teams. |
C | All choices are correct. |
D | Managing the interdependent projects. |
Question 43 Explanation:
Managing the interdependent projects is the role pf Program Manager.
[1 - 9 Human Resources, and 1 Project Management Framework]
Question 44 |
Which information is needed for developing project team?
A | Project staff assignments, team performance assessment, and resources calendars. |
B | Enterprise environmental factors, project management plan, and resources calendars. |
C | Project management plan, project resource plan, and resources calendars. |
D | Project staff assignments, project management plan, and resources calendars. |
Question 44 Explanation:
Project staff assignments, project management plan, and resources calendars.
[1 - 9.3.1 Develop Project Team: Inputs]
Question 45 |
Which types of Human Resources are used on the projects?
A | Administrative and behavioral. |
B | Business and technical. |
C | Managerial and technical. |
D | Coordinating and executing. |
Question 45 Explanation:
Administrative and behavioral types of Human Resources are used on the projects.
[1 - 9 Human Resources]
Question 46 |
Which of the following information will be needed to manage a project team?
A | All choices are correct. |
B | Team performance assessments, and performance reports.. |
C | Project staff assignments and project plan. |
D | Organizational process assets. |
Question 46 Explanation:
All choices are correct.
[1 - 9.4.1 Manage Project Team: Inputs]
Question 47 |
Which tool and techniques can be used to developing project team?
A | Interpersonal skills, and co-location. |
B | Training, team building activities. |
C | All choices are right. |
D | Recognition and rewards. |
Question 47 Explanation:
All choices are right.
[1 - 9.1.3 Develop Project Team: Outputs]
Question 48 |
Which of the following processes is improving the competencies, team interaction, and the overall environment to enhance project performance?
A | Develop project team. |
B | Acquire project team. |
C | Develop human resource plan. |
D | Manage project team. |
Question 48 Explanation:
Develop project team is the process to improving the competencies, team interaction, and the overall environment to enhance project performance.
[1 - 9 Human Resources]
Question 49 |
The project team is not sure what exactly should be done next. Who is responsible in this situation?
A | Project management office. |
B | Project manager. |
C | Sponsor. |
D | Functional manager. |
Question 49 Explanation:
Project manager is responsible to assign resources and ensure they know what and when they have to do.
[1 - 9 Human Resources]
Question 50 |
Which of the following is not included in Project Resource Management Plan?
A | Staffing management plan. |
B | Roles and responsibilities. |
C | Project charter. |
D | Project organization chart. |
Question 50 Explanation:
Roles and Responsibilities chapter - provides the name of the roles, and describes their authority, responsibilities, boundaries, and required competency of skills. Project Organization Chart - - helps to identify the relations between departments and team members, and some key roles. Staffing Management Plan - describes when and how human requirements will met.
[1 - 9.1.3 Develop Human Resources Plan: Output]
Question 51 |
What is the role of the project team?
A | Apply ground rules, and execute project management plan to complete work determined in project scope statement. |
B | Recommend changes to the project, including corrective and preventing actions. |
C | All choices are right. |
D | Attending project team meeting, and conducting project improvement activities. |
Question 51 Explanation:
A project team is a team whose members usually belong to different groups, functions and are assigned to activities for the same project. A team can be divided into sub-teams according to need. Usually project teams are only used for a defined period of time. They are disbanded after the project is deemed complete. Due to the nature of the specific formation and disbandment, project teams are usually in organizations.
http://en.wikipedia.org/wiki/Project_team
[1 - 9 Human Resources]
Question 52 |
What is the output of Develop Project Resource Management Plan?
A | All choices are right. |
B | Project resource management plan. |
C | Award and recognition system. |
D | Activity resource requirements. |
Question 52 Explanation:
Project Resource Management plan is the only output of the Develop Project Resource Management Plan process. Activity resource requirements is an input, and award and recognition system is a part of the Project Resource Management Plan.
[1 - 9.1.1 Develop Human Resources Management Plan: Input]
Question 53 |
What does sponsor do during project planning?
A | Provide project with time to plan. |
B | Determine the project reports to oversee the project. |
C | Review WBS, and lists the potential risks. |
D | All choices are right. |
Question 53 Explanation:
All choices are right.
Question 54 |
What does not a project manager need to create human resource management plan?
A | Activity resource requirements. |
B | Project charter. |
C | Organizational process assets. |
D | Enterprise environment factors. |
Question 54 Explanation:
Project charter may contain conceptual information about human resources and would not be needed in Develop Project Resources Plan process. Other choices are only inputs into this process.
Question 55 |
What is the role of sponsor play during project executing?
A | Enforcement of quality polices and providing expert judgement. |
B | All choices are right. |
C | Protecting project from external influence. |
D | Supporting project manager in resolving conflicts. |
Question 55 Explanation:
All choices are right.
[1 - 9 Human Resources]
Question 56 |
Which of the following processes is identifying and documenting project roles, responsibilities, and required skills, reporting relationship, and creating a staffing management plan?
A | Develop human resource plan. |
B | Manage project team. |
C | Develop project team. |
D | Acquire project team. |
Question 56 Explanation:
Develop human resource plan is the process to identifying and documenting project roles, responsibilities, and required skills, reporting relationship, and creating a staffing management plan.
[1 - 9 Human Resources]
Question 57 |
Which of the following tools and techniques to be used in managing project team?
A | Issue log, interpersonal skills. |
B | Observation and conversation. |
C | Project performance appraisals, and conflict management. |
D | All choices are right. |
Question 57 Explanation:
All choices are right.
[1 - 9.4.2 Manage Project Team: Tools and Techniques]
Question 58 |
The project management team is responsible for _____ activities such as initiating, planning, executing, monitoring, controlling, and closing the various project phases?
A | Developing the detailed WBS dictionary. |
B | Commenting of the developed code and technical documentation. |
C | Executing work package. |
D | Management and leadership. |
Question 58 Explanation:
The project management team is responsible Management and Leadership activities including initiating, planning, executing, monitoring, controlling, and closing the project phases and whole project. Other choices belong to the team members that assigned to particular roles and activities.
[1 - 9 Human Resources]
Question 59 |
What does not a Staffing Management Plan include?
A | Project Resource Management Plan. |
B | Staff acquisition plan, resource calendars, and staff release plan. |
C | Training needs, and compliance. |
D | Recognition and rewards, and safety. |
Question 59 Explanation:
Staffing Management Plan is the part of Project Resource Management Plan. It describes when and how human requirements will met. This document is updating constantly due to acquisition of resources and team development actions.
[1 - 9.1.3 Develop Human Resources Plan: Output]
Question 60 |
What does project manager use in Acquire Project Team process?
A | Virtual teams. |
B | Acquisition. |
C | Pr-assignment, and negotiation. |
D | All choices are right. |
Question 60 Explanation:
All choices are right. This question means what tools and techniques are used in this process.
[1 - 9.2.2 Acquire Project Team: Tools and Techniques]
Question 61 |
What is the role of functional manager on the project?
A | Approving project management plan and final schedule. |
B | Managing activities related to the related functional area. Influencing the team member performance and utilization. |
C | All choices are right. |
D | Recommending changes to the project, including preventive and corrective actions. |
Question 61 Explanation:
All choices are right.
[1 - 9 Human Resources, and 1 Project Management Framework]
Question 62 |
A team member would not perform as planned. Who of the following people should be involved in this situation?
A | Functional manager. |
B | Project manager. |
C | Team. |
D | Sponsor. |
Question 62 Explanation:
Functional manager owns the resources, provides control their control, and is responsible for their performance.
[1 - 9 Human Resources]
Question 63 |
Which of the following enterprise environmental factors are not used as input to Develop Project Resource Management Plan process?
A | Marketplace conditions. |
B | Organizational culture and structure, and existing resources. |
C | Configuration management system. |
D | Personnel administration policies. |
Question 63 Explanation:
The enterprise environmental factors related to human resources are related to the cultural environment and structural interactions between the resources, organizations will be involved in the project, and availability of training. It also important to recognize if there any hidden agendas or anyone is negatively influences the project. Personal administration policies will help to interact with resources managers and functional managers to influence the project resources performance. The information about marketplace condition may help to identify possible lose. For example, there is a risk of losing a high-demand skilled personnel for more competitive compensation on the market.
[1 - 9.1.1 Develop Human Resources Management Plan]
Question 64 |
What of the following is wrong about project manager's role related human resources?
A | Creating a human resource plan. |
B | Provide resources to the project. |
C | Identify the gap of knowledge and skills in the team members are needed, and assure the training was provided. |
D | Creating job description for team members and other stakeholders on the project. |
Question 64 Explanation:
It is responsibility of resource managers and functional manager to provide resources to the project.
[1 - 9 Human Resources]
Question 65 |
A project manager does not have required authority to run project. Who assigns project manager's authority?
A | Project sponsor. |
B | Functional manager. |
C | Stakeholder. |
D | PMO. |
Question 65 Explanation:
Project sponsor assigns project manager with appropriate authority via project charter.
[1 - 9 Human Resources]
Question 66 |
Which of the following processes is tracking team member performance, providing feedback, resolving issues, and managing changes to optimize project performance?
A | Manage project team. |
B | Develop project team. |
C | Acquire project team. |
D | Develop human resource plan. |
Question 66 Explanation:
Manage project team is the process to tracking team member performance, providing feedback, resolving issues, and managing changes to optimize project performance.
[1 - 9 Human Resources]
Question 67 |
The project team re-evaluated the work and determined that extra time will be needed to complete the project. Who is a key person in this situation?
A | Sponsor. |
B | Functional manager. |
C | Stakeholder. |
D | Project manager. |
Question 67 Explanation:
Perhaps, the project charter has time constrain; changes in project charter require involvement of the Sponsor.
[1 - 9 Human Resources]
Question 68 |
The project team disagrees with priorities among activities. Who is responsible for this situation?
A | Sponsor. |
B | Team. |
C | Project manager. |
D | Functional manager. |
Question 68 Explanation:
Project manager should coordinate the network diagram and critical path with the team, and setup priorities among activities on the project.
[1 - 9 Human Resources]
Question 69 |
What of the following is true about Project Manager's role?
A | Coordinate interactions between the project team members and stakeholders. |
B | Is responsible for the project, but not always in charge of resources. Influences the project team and the ground rules, and resolves team issues. |
C | All choices are right. |
D | Should be assigned not later than Project Initiation, and may participate in creation of Project Charter. |
Question 69 Explanation:
All choices are right.
[1 - 9 Human Resources, and 1 Project Management Framework]
Question 70 |
What of the following is wrong about project manager's responsibilities?
A | Crating a project charter. |
B | Coordinating with resource manager for the availability of resources. |
C | Creating and developing a project team. |
D | Determine the skills and quantity of required resources. |
Question 70 Explanation:
Crating a project charter is responsibility of sponsor and stakeholders, unless it was specifically assign to the project manager.
[1 - 9 Human Resources]
Question 71 |
Two members of a project team has personal disagreements. Who is responsible to solve their conflict?
A | Project Manager. |
B | Disagreed people. |
C | PMO. |
D | Project Sponsor. |
Question 71 Explanation:
Disagreed people should find a solution for their personal disagreement without involving of others.
[1 - 9 Human Resources]
Once you are finished, click the button below. Any items you have not completed will be marked incorrect.
Get Results
There are 71 questions to complete.
← |
List |
→ |
Return
Shaded items are complete.
| 1 | 2 | 3 | 4 | 5 |
| 6 | 7 | 8 | 9 | 10 |
| 11 | 12 | 13 | 14 | 15 |
| 16 | 17 | 18 | 19 | 20 |
| 21 | 22 | 23 | 24 | 25 |
| 26 | 27 | 28 | 29 | 30 |
| 31 | 32 | 33 | 34 | 35 |
| 36 | 37 | 38 | 39 | 40 |
| 41 | 42 | 43 | 44 | 45 |
| 46 | 47 | 48 | 49 | 50 |
| 51 | 52 | 53 | 54 | 55 |
| 56 | 57 | 58 | 59 | 60 |
| 61 | 62 | 63 | 64 | 65 |
| 66 | 67 | 68 | 69 | 70 |
| 71 | End |
Return
You have completed
questions
question
Your score is
Correct
Wrong
Partial-Credit
You have not finished your quiz. If you leave this page, your progress will be lost.
Correct Answer
You Selected
Not Attempted
Final Score on Quiz
Attempted Questions Correct
Attempted Questions Wrong
Questions Not Attempted
Total Questions on Quiz
Question Details
Results
Date
Score
Hint
Time allowed
minutes
seconds
Time used
Answer Choice(s) Selected
Question Text
All done
Need more practice!
Keep trying!
Not bad!
Good work!
Perfect!